NEWS
Shenzhen Weitu Hongda Completes UPS Room Project for Shanghai Centers for Disease Control and Prevention New Construction Project
Recently, the new construction project of the Shanghai Centers for Disease Control and Prevention (CDC) has been relocated and put into operation.
The construction of the new Shanghai CDC project officially began in December 2020, with the steel structure completed in October 2022. The project covers a total construction area of over 110,000 square meters, and the park includes the construction of an emergency command center, a national emergency platform for the prevention and control of acute infectious diseases, as well as a number of high-level laboratory platforms.
To meet the backup power requirements for office and laboratory equipment at the Shanghai CDC, Weitu Hongda provided six sets of industrial frequency UPS systems, effectively ensuring the safety and operational continuity of equipment in the park’s integrated office building, microbiology laboratory, and physicochemical laboratory.